Padma Multipurpose Bridge Project (Loan-2701)

DATE OF ENTRY

25 April 2012

PROJECT STATUS

Ongoing

Funding Organisation

Asian Development Bank

A separate climate change study was conducted for this project. The design of the bridge took into consideration changes in: temperature, precipitation, seal level, flood flows, low flows, salinity, wind speed and sediment transport.

Funding Organisation: 

Asian Development Bank

Contact Details