Project

10.01.2013

Emergency Flood Recovery (Sector) Project (Loan-2541)

SHARE THIS PAGE:

The project impact will be to reduced economic losses and social disruption from extreme weather in the future. The outcome will be the restoration of economic and social activities in affected areas to pre-disaster levels. Project outputs include: (i) Road infrastructure rehabilitated and climate-proofed; (ii) Agricultural drainage schemes rehabilitated and climate-proofed; and (iii) Water supply intake structures repaired and climate-proofed.